Blower Door testing for New Construction

Ener G provides blower door testing for Maryland, Virginia, and DC services required by the new 2018 IECC Energy Conservation Code.  Maryland requires 3 ACH's (air changes per hour), Virginia 5 ACH's, and DC 5 ACH's.  ACH's or air changes per hour is the volume of air that is exchanged between the outside and inside of the home.  Or air infiltration and exfiltration (air leakage) that is the maximum amount of air allowed, represented in CFM (cubic feet per minute).

The International Energy Conservation Code for 2018 requires more insulation, much tighter building envelopes, tighter ductwork, more energy efficient windows & lighting as compared to the IECC 2009 code. Ener G will help you to stay in compliance with the new green building code & Energy Star requirements, as well as performing your blower door tests with confidence and efficiency.

Learn More About Our Services:

Mobirise

Blower Door Testing

In Maryland you have to have less than 3 ACH's (air changes per hour) to pass this test.  Average home tests at 7 ACH's or more.

Mobirise

Monometer Reading

Our testing monometer above shows depressurization to negative 50.1 Pascals on the left of the screen and the CFM at 3261 on the right of the screen.  This shows the house achieved proper depressurization and the rate of the air infiltration. 


IECC 2018 Building Code Reguirements - Our Process

NEW CONSTRUCTION BLOWER DOOR TESTING GUIDELINES

Many Cities and Counties in Maryland require that the overall air infiltration of a new construction residence be tested and verified to be in compliance with the applicable area’s energy codes prior to homeowners taking occupancy.

This is called Blower Door Testing and is most often performed as one of the last steps of the construction process. The test is performed using a blower door. Because this test is performed at the end of construction, it is important to monitor and perform certain actions throughout the construction of the residence or building.

AIR INFILTRATION CONSIDERATIONS THROUGHOUT THE CONSTRUCTION PROCESS

    - Installation of a properly sealed home wrap at the exterior shell
    - Installation and sealing of windows
    - Appropriate sealing of all penetrations through the exterior shell
    - Appropriate sealing of rim joists and sill plates
    - Completion and finishing of drywall
    - Installation of all light fixtures / electrical components / outlet covers
    - Installation of floor coverings throughout the property

AIR INFILTRATION CONSIDERATIONS AT THE TESTING PHASE 

    - Ensure that all windows are closed and latched
    - Ensure that all exterior doors (including garage access door) are appropriately weather stripped and can be closed and latched
    - Attic hatches should be insulated and rest on weather stripping
    - All bath fans and range hoods should be completely installed

REQUIREMENTS FOR ACHIEVING A PASSING TEST RESULT

    - Follow the blower door checklist items below to ensure you pass with ease
    - The residence should be checked prior to scheduling the BD test for the items above or consult with the General Contractor about completion to            date
    - Upon testing, the technician will tour the house to ensure these items are completed
    - The technician will select an appropriate door and set up the BD testing equipment
    - The house will be depressurized to determine the overall infiltration rate. This may take only a few minutes to produce results but requires that no          one enter or exit the property for the duration of the test
    - If the results are compliant, the test is complete and a report will be produced by the end of the day
    - If the results are not compliant, the technician will set the test to a lower pressure and begin diagnostics on the residence to determine where the         air flow may be occurring. This step in the process may take only a few minutes or may take as long as an hour to accurately determine the         source of the non-compliant test results.  The use of infrared (IR) scanning equipment is used to help locate leakage areas.

Address

Olney, MD 20832 

Contacts

Email: rnelson@ener-gsave.com
Phone:  301-363-1148 
Fax: 301-363-1148

Links

Energy Star Home Performance 
Pepco Home Performance 
BGE Home Performance